
Item Description
EPT Design and style Squander Rubber Pyrolysis Plant
Organization transient introduction
HangZhou ZXiHu (West Lake) Dis.Hu (West Lake) Dis.ng GreEPTch Co,.Ltd is a specialist establishment engaged in the recycling and uEPTzation of squander assets which incEPTs scientific research, style, deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment, producing, installation, commissioning, education and consumer support. The headquarter of the firm is found in ZheEPTng . Our principal products is waste tires products, waste oil sludge treatment tools, dwelling XiHu (West Lake) Dis.Hu (West Lake) Dis.bage equipment, digital squander products, healthcare waste gear, petrochemical waste gear and connected squander recycling products. We also undertake government surroundings task like engineering layout, design and testing date.
Key parts of This Product
one. Horizontal type revolving reactor two. Heavy oil tank
3.Automatic carbon black discharge 4. Fuel separator
5.Automated carbon black discharge six. Controller
7.Fuel recycling system 8. Draft admirer 9. Motors
ten.Slag cart eleven. Cooling tower twelve. Oil pipe
13.Oil tank fourteen. Water Pool fifteen. Blower
Manufacturing procedure
one. Set the waste tires, plastic or rubber into the reactor, catalysis and pyrolysis them.
two.Then output the oil gas, the oil gasoline will go by means of the condenser and be liquefied to oil.
3. Following ending the method, the carbon black will be discharged from the EPTized carbon black doorway.
4. Some portion of the oil gas which can’t be liquefied will be burned as fuel to warmth the reactor right by way of the waste gasoline burning system. Between the oil tank and the heating furnace there wil be the h2o sealing tank to perform as anti-hearth technique. And the squander smoke will be processed by desulfurization technique to start with and then discharged into the air
Specification
| NO | Title | Parameter |
| 1 | The uncooked content | squander tyres, plastic and oil sludge |
| two | Overall Capacity | 5t/working day, 10t/day, 12t/working day, 50t/day |
| three | The dimensions of reactor | 2.2*six/6.6, 2.four*6/six.6, two.6*6/six.6, two.eight*six/six.six |
| 4 | Regular oil efficiency | tyre:40%-fifty%, plastic:sixty%-70% |
| 5 | Typical carbon efficiency | 30%-35% |
| 6 | Common steel productivity | ten%-15% |
| 7 | Common squander-gas productiveness | 5% |
| 8 | Pyrolysis time | 8hours |
| 9 | Discharge time | 3hours |
| 10 | Feeding time | 1hour |
Advantage of pyrolysis EPT
one. Large oil output charge: forty five%-55%
2. Double discharging technique
three. PLC computerized management method
4. Full-vacuum processing environment
five. Automated rolling EPT tends to make the circle excellent.
six.Rigorous take a look at program to assure the high quality of the merchandise and it is components.
7. Non pollution, ZTE series desulfurization system.
eight.XiHu (West Lake) Dis.hu (West Lake) Dis.nity design and style, automatic carbon black discharging method, time-preserving and labour-saving.
Obtainable Uncooked Substance And Oil Output
| Product | Raw Supplies | Oil Output |
| Squander Tires | Steel Tires | 40%-forty five% |
| Nylon Tires | 40% | |
| Bicycle Tires | 35% | |
| Waste Plastic | Plastics luggage (shopping) | 50% |
| Weaves or handbags | sixty% | |
| Cable Pores and skin | PE Cable Skin | 35% |
| PVC Cable Pores and skin | twenty five% | |
| Pure Rubber Cable Pores and skin | 35% | |
| Telephone Line | fifty% | |
| Squander Paper Mixture from Paper Manufacturing unit | Rough Material | 15% |
| Washed Content | 20-25% | |
| PE Materials | 70% | |
| Sneakers Soles | Sports activities Sneakers Soles | twenty five-33% |
| Black Rubber Soles | 35% | |
| Gum Rubber Soles | forty five% | |
| Other folks | Frequent Rubber Tubes | thirty% |
| Carpets | 35% | |
| Aluminum Foil Paper | thirty% | |
| Vehicle Glass Layering | 50% | |
| PP EPTrage Bottle | 50% |
Certification
Right after-sale service
1. Delivery time– It will be within fifteen doing work daEPTafter we obtain the deposit.
two. Guarantee- The warranty time period is two Several years(Other suppler provide 1 year guarantee), engineers obtainable to support at any time.
3. Set up and Training– Our Company will dispatch technician to XiHu (West Lake) Dis.Hu (West Lake) Dis. set up and instruction for free, making sure the procedure security. The installation time period shall be 1 thirty day period normally, buyers will shell out further income for the technician with the value of USD a hundred.00 for every working day.
four. 24-Hrs phone support .
Typical telephone checking out to check out if there is anything at all we can do for you, upkeep XiHu (West Lake) Dis.Hu (West Lake) Dis., easily worn-out parts and catalyst offering, on-internet site routine maintenance.
Make contact with us

